A lot of the details could not be determined until after the strip out phase and the features were uncovered. For this reason, the design process was ongoing on a week to week basis and heavily discussed and agreed with the client.
대한민국 No.1 모터,펌프,보일러,배관자재 전문점 (주)대영셀콤